Primer complete

Since I forgot to post yesterday, I put the second coat of primer on the back wall before heading to the store for some more supplies. It was too late when we got back to do anything else so I got at it after work today. I managed to complete the second coat of primer on all surfaces including that dreaded front side of the pillar.

Tomorrow I’ll be checking for any necessary areas that need touchups (and there are many) and then I’ll be installing the electrical components, which are required for inspection. Hopefully, I can get everything installed tomorrow and then we can meet with the flooring guy tomorrow or Friday. I’m at a complete loss as to what I want to do for flooring, so I’m going to outsource my brain for that. I know carpeting is the best choice for the theater, but do we do it everywhere?

A problem for another day. For tonight, it’s time for a shower and to ponder how the now 11-0 Steelers managed to almost lose to the 2nd and 3rd stringers of the Ravens (thanks to COVID).

One thought on “Primer complete

Leave a reply to fagnanis Cancel reply