While I didn’t get a ton finished today, I did put the last few pieces of insulation up. I toyed with using some scrap insulation to assist… Read more “Insulation Installed”
Category: Fagnani Theater
Itchy day
I installed about 75% of the insulation today after receiving my framing/electric/mechanical inspection approval. It’s always nice to do something that provides a nice visual (and audible… Read more “Itchy day”
Inspection PASSED!
Bing, bang, boom, inspection passed. Next steps…insulation, drywall, electric devices, and banister system then final code inspection.
HVAC Complete
Quick update for the day…HVAC has been installed. I also took 5 seconds to run the Surround Left speaker wire. It’s the one on the same wall… Read more “HVAC Complete”
Rough electric complete
Though it doesn’t feel like I did a lot today, it certainly feels like we turned some sort of page. I was able to finish up the… Read more “Rough electric complete”
Roughed in some outlets
Today was sort of a slow day on the basement front. All I was able to complete was the stripping and rough in of a few electrical… Read more “Roughed in some outlets”
It’s been a few days
After neglecting to post the last few days, here are some of the odds and ends I’ve been working on: 1. Installed a new home run to… Read more “It’s been a few days”
Wires wires wires…
Spent my evening securing and labeling wires. I also moved the sub supports up a bit so they would be behind the screen. I made some decent… Read more “Wires wires wires…”
So close to inspection time
Today was a productive day but another one without a ton of visual feedback. Here’s what I accomplished: – Ran the final electric circuit (main stairwell lights/switches)… Read more “So close to inspection time”
Low voltage
Today was full of wire pulls. After I finished up the last two speaker supports (the subs), I ran all of the speaker wire, the RG6 and… Read more “Low voltage”