    Insulation Installed

    While I didn’t get a ton finished today, I did put the last few pieces of insulation up. I toyed with using some scrap insulation to assist… Read more “Insulation Installed”

    November 10, 2020 by Matt Fagnani

    Itchy day

    I installed about 75% of the insulation today after receiving my framing/electric/mechanical inspection approval. It’s always nice to do something that provides a nice visual (and audible… Read more “Itchy day”

    November 9, 2020 by Matt Fagnani

    Inspection PASSED!

    Bing, bang, boom, inspection passed. Next steps…insulation, drywall, electric devices, and banister system then final code inspection.

    November 9, 2020 by Matt Fagnani

    HVAC Complete

    Quick update for the day…HVAC has been installed. I also took 5 seconds to run the Surround Left speaker wire. It’s the one on the same wall… Read more “HVAC Complete”

    November 6, 2020 by Matt Fagnani

    Rough electric complete

    Though it doesn’t feel like I did a lot today, it certainly feels like we turned some sort of page. I was able to finish up the… Read more “Rough electric complete”

    November 5, 2020 by Matt Fagnani

    Roughed in some outlets

    Today was sort of a slow day on the basement front. All I was able to complete was the stripping and rough in of a few electrical… Read more “Roughed in some outlets”

    November 4, 2020 by Matt Fagnani

    It’s been a few days

    After neglecting to post the last few days, here are some of the odds and ends I’ve been working on: 1. Installed a new home run to… Read more “It’s been a few days”

    November 3, 2020 by Matt Fagnani

    Wires wires wires…

    Spent my evening securing and labeling wires. I also moved the sub supports up a bit so they would be behind the screen. I made some decent… Read more “Wires wires wires…”

    October 29, 2020 by Matt Fagnani

    So close to inspection time

    Today was a productive day but another one without a ton of visual feedback. Here’s what I accomplished: – Ran the final electric circuit (main stairwell lights/switches)… Read more “So close to inspection time”

    October 28, 2020 by Matt Fagnani

    Low voltage

    Today was full of wire pulls. After I finished up the last two speaker supports (the subs), I ran all of the speaker wire, the RG6 and… Read more “Low voltage”

    October 26, 2020 by Matt Fagnani

    Posts navigation

    Older posts
    Newer posts

    Follow Matt

    • Facebook
    • Instagram
    • X
    • LinkedIn
    • YouTube
    • Snapchat
    • Spotify

    Follow Jody

    • Instagram
    • Snapchat
    • Pinterest
    • X
    • Spotify
    • Home
    • Fagnani Theater
    • Jody
    • Gallery
    • All Posts
    Create a website or blog at WordPress.com
    • Subscribe Subscribed
      • Fagnani Family
      • Already have a WordPress.com account? Log in now.
      • Fagnani Family
      • Subscribe Subscribed
      • Sign up
      • Log in
      • Report this content
      • View site in Reader
      • Manage subscriptions
      • Collapse this bar
     

    Loading Comments...