Challenging evening

Welp, my hands officially hurt. 😂 I had a rough evening today in the ole Fagnani Theater. The last corner of the back utility closet sure was a challenge. It has a low ceiling due to the bulkhead and the main return is so close to the concrete and sewage pipe that I had to get creative. Needless to say I didn’t get as much completed as I usually would, but I guess it was productive.

Today I completed the back utility room wall and the 90 degree turn toward the stairwell. I still need to rough in the doors, but that’s on tap for tomorrow or Thursday.

Oh, I almost forgot…I also ripped the railing and safety wall down on the stairs. Boy was that fun since EVERY screw was stripped and they used 1,000 of them. I’ll be starting on that wall sometime this week and will be opening it up from the 5th step down for a banister system.

Alright, time for a shower…my son said I smell “weird.”