Thanks to some help from the wife and my dad, we were able to crush out a ton of work in the last day or so.
We finished up the right wall, added the utility door rough opening and finished about 90% of the bulkhead. We also added a few studs to complete the back wall and shot the bottom plates down for the back left utility room. One and a half more walls, the stairwell, two door roughs, ceiling strapping and the framing will be complete.
Don’t mind the mess in the pictures, didn’t take as much time as normal cleaning up the place.